Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Rumah 2: A Beam of Light in the Desert

    September 10, 2026

    RAMINVEST HOLDING Advances Mauritania Gold Exploration Following 50.14 g/t Gold Assays at Wompou Project

    September 10, 2026

    Gold Remains Near $4,400 Ahead of U.S. Inflation Data

    September 10, 2026
    Facebook X (Twitter) Instagram
    • Home
    • Contact Us
    Emirat Daily: The Emirates’ essential daily read.Emirat Daily: The Emirates’ essential daily read.
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Emirat Daily: The Emirates’ essential daily read.Emirat Daily: The Emirates’ essential daily read.
    Home » Rumah 2: A Beam of Light in the Desert
    PR Newswire

    Rumah 2: A Beam of Light in the Desert

    September 10, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email

    RIYADH, Saudi Arabia, Sept. 10, 2026 /PRNewswire/ — Harbin Electric International (HEI), a leading Chinese power engineering and energy company, is delivering the Rumah-2 Combined-Cycle Power Plant in Saudi Arabia as part of the country’s efforts to advance its energy transition under Vision 2030. On June 30, 2026, Gas Turbine Unit 1 was successfully hoisted into position, marking the full launch of the project’s installation work and a significant milestone in the construction of the power plant.

    As a landmark energy transition project for Saudi Arabia’s Vision 2030, the plant will replace conventional fuel oil power generation with natural gas. Upon completion, it is expected to cut carbon dioxide emissions by over 5 million tons annually.

    Rumah 2: A Beam of Light in the Desert takes viewers behind the scenes of this major energy project, following the journey of a 253-ton gas turbine from transportation to final installation.

    After its original transportation route was disrupted, the turbine was rerouted to Saudi Arabia’s west coast and transported nearly 2,000 kilometers across the country to the project site. The transportation involved detailed route surveys, road reinforcements, bridge clearances, traffic diversions and overnight coordination with local authorities. At some points, the clearance between the equipment and infrastructure was measured precisely in mere centimeters.

    The turbine’s journey unfolds alongside another transformation: the construction of the power plant itself. When the project team first arrived, the site was little more than open desert. Over the following months, workers from China, Saudi Arabia, India and other countries worked together to build the facilities from the ground up, overcoming extreme heat, tight schedules, resource constraints and the challenges of working across cultures.

    Shot in a documentary style without staged scenes, the film captures the real people, challenges and moments behind the project. Chinese engineers, Saudi partners and international team members share their experiences of building not only a power plant, but also trust and cooperation on an international construction site.

    From a massive gas turbine moving through the desert in the early hours of the morning to its final position at the heart of the power plant, Rumah 2: A Beam of Light in the Desert is a story of engineering, teamwork and perseverance—and of how a once-empty stretch of desert is being transformed into infrastructure for a future with more sustainable energy.

    YouTube Link: https://youtu.be/-KBf1vb32Mw

    Cision View original content to download multimedia:https://www.prnewswire.co.uk/news-releases/rumah-2-a-beam-of-light-in-the-desert-302875149.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    RAMINVEST HOLDING Advances Mauritania Gold Exploration Following 50.14 g/t Gold Assays at Wompou Project

    September 10, 2026

    baraka launches investments on DFM and ADX for UAE investors

    September 10, 2026

    Toku’s Middle East Expansion Runs Ahead of Plan: Talabat Live Across Eight Markets and UAE Subsidiary Incorporated

    September 10, 2026
    Latest News

    Gold Remains Near $4,400 Ahead of U.S. Inflation Data

    September 10, 2026

    US Aims to Break China’s Battery Lead

    September 9, 2026

    Panama Canal Plans Transit Limits Amid Drought

    September 9, 2026

    Volkswagen Converts Osnabrück Plant to Defense Facility

    September 9, 2026

    Etihad to Launch Saudi Red Sea Route

    September 9, 2026

    Indonesia Flights Affected by Anak Krakatau Ash

    September 8, 2026

    Egypt’s Reserves Hit Record $57.2B

    September 8, 2026

    Serian Declares Emergency Amid Smoke Crisis

    September 7, 2026
    © 2026 Emirat Daily | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.